Back to the projects

Carlsberg Prinisko WWT

Place Bulgaria
System Configuration Turnkey Project
Description Turnkey Project of building Wastewater Treatment Plant for Carlsberg. The capacity is 1.500 m3/day flowrate. Biogas will be utilized at the boiler of the plant and green energy will be gained as an output.
Date 2015